Chernihiv School No. 3

We received equipment from our partners

July

The official launch of the solar station

August 8

July 25 - August 1

Installation of the solar panels
100RESforShcools
A solar plant with energy storage systems was put into operation at Chernihiv secondary school №3

A solar station equipped with electricity storage systems with a total capacity of 20 kW was installed on the roof of the school. These systems provide independent power supply for the school for up to 4 hours when the main source of electricity is turned off. From now on, 30% of the school's annual energy consumption will be provided by solar energy.

August 8

The official launch of the solar station

Installation of solar panels took place on July 25 - August 1.

️Technical information about the object:

The power of the station is 20 kW

The capacity of battery units is 40.6 kWh

The power of 1 module is 455 W.

We received equipment from our partners.
July

In July, we received equipment from our partners: ZCS Azzurro and Menlo Electric.

Photoelectric modules Jinko 455 — 58 pcs

Inverter equipment ZCS Azzurro 3PH HYD20000 ZSS ZP1ES020P15336 — 1 pc

Lithium-iron-phosphate batteries — 7 pcs.

Donors: Menlo Electric S.A., ZCS Azzurro

Technical partner: UNISOLAR.

The total budget of the project: 52,000 EUR